Countywide - EV charging (November 2026)
Thank you for visiting our consultation page.
The local EV infrastructure programme
We want to give Oxfordshire residents the confidence to switch to an electric vehicle. As part of our government and partner funded EV infrastructure programme we will be providing around 1,500 new public chargers across the county over the next two years. The majority of chargers will be in council run car parks and community hubs, with chargers installed on public streets only where needed. You can read more about the full programme by visiting our website.
Public on-street chargers
An estimated 30% of Oxfordshire residents don't have a driveway or private off-street parking. As a result, we plan to install around 500 new public chargers on the public highway in areas where a high proportion of residents lack off-street parking.
For the consultation on sites in Oxford city, please visit this page.
Have your say
Please make time to read the information below, the frequently asked questions and the downloadable documents before you complete the survey. The survey will close at 5pm on 8 January 2027.
We will try to answer simple queries during the consultation. More complex questions will be answered as part of consultation reporting process.
County charger sites
You can feedback on any or all these dedicated Electric Vehicle (EV) charging only parking places proposed for different areas of the county by completing the survey at the bottom of this page.
Full detail of the exact restrictions and specific locations can be found in the individual consultation plans.
| Area | Street location | Proposed number of charging bays and charging points |
| Cherwell, Kidlington | Lyne Road (North side) | Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two dual 7kW chargers) |
| South Oxfordshire, Henley-on-Thames | Boston Road (South side) | Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers) |
| South Oxfordshire, Henley-on-Thames | Greys Road (South side) | Six new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with three dual 7kW chargers) |
| South Oxfordshire, Henley-on-Thames | Marmion Road (North side) | Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers) |
| South Oxfordshire, Henley-on-Thames | Vicarage Road (East side) | Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two dual 7kW chargers) |
| South Oxfordshire, Thame | Chinnor Road (North side) | Six new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with three dual 7kW chargers) |
| South Oxfordshire, Wallingford | Borough Avenue (North side) | Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers) |
| South Oxfordshire, Wallingford | St Johns Road (South side) | Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers) |
| Vale of White Horse, Wantage | Upthorpe Drive (South side) | Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers) |
| West Oxfordshire, Burford | Sheep Street (North side) | Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers) |
| West Oxfordshire, Carterton | Stoneleigh Drive (North side) | Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers) |
What happens next?
The County Council will review the responses and if necessary (i.e. if objections are received) prepare a report to be presented to the Cabinet Member for Highway Management at a meeting scheduled for early in 2027. This will be public meeting at which members of the public may apply to speak. The agenda and reports for meetings will be made available on the Oxfordshire County Council web site about a week before the meeting (please note that occasionally it is necessary to defer reports to a later meeting, and it is therefore advisable to check the agenda ahead of attending a meeting). The Forward Plan of decisions meetings can be viewed here.
More information
- Electric vehicles and charge point infrastructure web pages - Electric vehicles | Oxfordshire County Council
- Information on the full programme, site selection, sites announced so far and our charge point operators - Oxfordshire local EV infrastructure | Oxfordshire County Council
- September 2026 – new sites approved media release - First sites approved for Oxfordshire’s electric vehicle charging programme
- June 2026 - Oxfordshire moves forward with programme to support residents without private parking to switch to EVs.
- March 2024 - Oxfordshire awarded £3.6 million to triple public electric vehicle charging provision by 2025
Here is an example of what an EV charger will look like when installed.