FAQs
How do we choose sites?
When choosing EV charger locations, we consider many factors, including who might need them now and in the future. Installation also depends on the electrical supply, site suitability, and other technical considerations, as well as on making the best use of the grant funding.
When choosing the sites for this consultation we used data analysis to create a long list of options, looked at what EV chargers were already available in off-street areas, what else may be coming forward as part of the full programme, and consulted with town and parish councils, local elected members and other interest groups. We also gathered feedback using our Let's Talk EV charger demand tracker. We then created a short list for this consultation.
You can find a full list of sites on the consultation page and individual site documents are available to download. Please look at this information before completing the survey where you can select which sites to feedback on.
Charging speed
Every proposed EV charging space in this consultation is a standard 7 kwh AC charger like the one shown in the image above. The main aim of the project is to provide near-home slower charging for people without driveways, allowing residents or visitors to charge up overnight when they are likely to be parked anyway and using tariffs that may be cheaper, rather than to provide rapid charging facilities.
Location of charging equipment
The infrastructure at each site comprises EV charge points, electrical cabinets/feeder pillar and regulatory signage. Where EV chargers need to be installed on the public highway, it will be done so as considerately as possible to minimise disruption to residents and those using active transport.
The charge points will be installed in grass verges where possible or on the footway as long as we can maintain 1.5 metres clearance on residential streets and two metres clearance on high footfall streets. If this is not possible EV chargers will be installed on buildouts on the carriageway. The electrical feeder pillars will always need to be installed on the footway for electrical safely reasons.
Number of chargers at each location
The standard charging units each have two sockets and can charge two cars simultaneously. Every site in this consultation includes at least two EV charge points which totals four charging bays. Installing this minimum number of bays at a time provide the best value for money from our government grant funding.