Countywide - EV charging (November 2026)

Share Countywide - EV charging (November 2026) on Facebook Share Countywide - EV charging (November 2026) on X (formerly Twitter) Share Countywide - EV charging (November 2026) on Linkedin Email Countywide - EV charging (November 2026) link

Thank you for visiting our consultation page.

The local EV infrastructure programme

We want to give Oxfordshire residents the confidence to switch to an electric vehicle. As part of our government and partner funded EV infrastructure programme we will be providing around 1,500 new public chargers across the county over the next two years. The majority of chargers will be in council run car parks and community hubs, with chargers installed on public streets only where needed. You can read more about the full programme by visiting our website.

Public on-street chargers

An estimated 30% of Oxfordshire residents don't have a driveway or private off-street parking. As a result, we plan to install around 500 new public chargers on the public highway in areas where a high proportion of residents lack off-street parking.

For the consultation on sites in Oxford city, please visit this page.

Have your say

Please make time to read the information below, the frequently asked questions and the downloadable documents before you complete the survey. The survey will close at 5pm on 8 January 2027.

We will try to answer simple queries during the consultation. More complex questions will be answered as part of consultation reporting process.

County charger sites

You can feedback on any or all these dedicated Electric Vehicle (EV) charging only parking places proposed for different areas of the county by completing the survey at the bottom of this page.

Full detail of the exact restrictions and specific locations can be found in the individual consultation plans.

Area
Street locationProposed number of charging bays and charging points
Cherwell, Kidlington
Lyne Road (North side)
Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two dual 7kW chargers)
South Oxfordshire, Henley-on-Thames
Boston Road (South side)
Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers)
South Oxfordshire, Henley-on-Thames

Greys Road (South side)
Six new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with three dual 7kW chargers)
South Oxfordshire, Henley-on-Thames

Marmion Road (North side)
Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers)
South Oxfordshire, Henley-on-Thames

Vicarage Road (East side)
Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two dual 7kW chargers)
South Oxfordshire, Thame

Chinnor Road (North side)
Six new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with three dual 7kW chargers)
South Oxfordshire, Wallingford


Borough Avenue (North side)
Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers)
South Oxfordshire, Wallingford


St Johns Road (South side)
Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers)
Vale of White Horse, Wantage
Upthorpe Drive (South side)
Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers)
West Oxfordshire, Burford
Sheep Street (North side)
Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers)
West Oxfordshire, Carterton
Stoneleigh Drive (North side)
Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers)

What happens next?

The County Council will review the responses and if necessary (i.e. if objections are received) prepare a report to be presented to the Cabinet Member for Highway Management at a meeting scheduled for early in 2027. This will be public meeting at which members of the public may apply to speak. The agenda and reports for meetings will be made available on the Oxfordshire County Council web site about a week before the meeting (please note that occasionally it is necessary to defer reports to a later meeting, and it is therefore advisable to check the agenda ahead of attending a meeting). The Forward Plan of decisions meetings can be viewed here.

More information

Here is an example of what an EV charger will look like when installed.


Thank you for visiting our consultation page.

The local EV infrastructure programme

We want to give Oxfordshire residents the confidence to switch to an electric vehicle. As part of our government and partner funded EV infrastructure programme we will be providing around 1,500 new public chargers across the county over the next two years. The majority of chargers will be in council run car parks and community hubs, with chargers installed on public streets only where needed. You can read more about the full programme by visiting our website.

Public on-street chargers

An estimated 30% of Oxfordshire residents don't have a driveway or private off-street parking. As a result, we plan to install around 500 new public chargers on the public highway in areas where a high proportion of residents lack off-street parking.

For the consultation on sites in Oxford city, please visit this page.

Have your say

Please make time to read the information below, the frequently asked questions and the downloadable documents before you complete the survey. The survey will close at 5pm on 8 January 2027.

We will try to answer simple queries during the consultation. More complex questions will be answered as part of consultation reporting process.

County charger sites

You can feedback on any or all these dedicated Electric Vehicle (EV) charging only parking places proposed for different areas of the county by completing the survey at the bottom of this page.

Full detail of the exact restrictions and specific locations can be found in the individual consultation plans.

Area
Street locationProposed number of charging bays and charging points
Cherwell, Kidlington
Lyne Road (North side)
Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two dual 7kW chargers)
South Oxfordshire, Henley-on-Thames
Boston Road (South side)
Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers)
South Oxfordshire, Henley-on-Thames

Greys Road (South side)
Six new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with three dual 7kW chargers)
South Oxfordshire, Henley-on-Thames

Marmion Road (North side)
Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers)
South Oxfordshire, Henley-on-Thames

Vicarage Road (East side)
Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two dual 7kW chargers)
South Oxfordshire, Thame

Chinnor Road (North side)
Six new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with three dual 7kW chargers)
South Oxfordshire, Wallingford


Borough Avenue (North side)
Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers)
South Oxfordshire, Wallingford


St Johns Road (South side)
Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers)
Vale of White Horse, Wantage
Upthorpe Drive (South side)
Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers)
West Oxfordshire, Burford
Sheep Street (North side)
Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers)
West Oxfordshire, Carterton
Stoneleigh Drive (North side)
Four new ‘Electric Vehicle (EV) Charging Only’ at all times parking bays (with two on-carriageway dual 7kW chargers)

What happens next?

The County Council will review the responses and if necessary (i.e. if objections are received) prepare a report to be presented to the Cabinet Member for Highway Management at a meeting scheduled for early in 2027. This will be public meeting at which members of the public may apply to speak. The agenda and reports for meetings will be made available on the Oxfordshire County Council web site about a week before the meeting (please note that occasionally it is necessary to defer reports to a later meeting, and it is therefore advisable to check the agenda ahead of attending a meeting). The Forward Plan of decisions meetings can be viewed here.

More information

Here is an example of what an EV charger will look like when installed.


  • Take Survey
    Share Oxfordshire Electric Vehicle (EV) charging parking places survey on Facebook Share Oxfordshire Electric Vehicle (EV) charging parking places survey on X (formerly Twitter) Share Oxfordshire Electric Vehicle (EV) charging parking places survey on Linkedin Email Oxfordshire Electric Vehicle (EV) charging parking places survey link